Skip to content
Planetas de Ninguém Waiting list

Holdings obtained outside channels

This should not be here.

What follows is internal material from one of the factions — the one that makes its living knowing what the others bury. It is incomplete, it is out of order, and some of it did not come across.

None of the redacted passages exist on this page. There is nothing to reveal in the source: what is missing is missing.

Record CASE 04-A Classification: Filed

The answer that opened the frontier

Origin: Copy of ruling · claims arbitration

Processing core, same series as the one on 04-A
Processing core, same series as the one on 04-A

The holder Vantor Industrial filed a complaint after the destruction of the processing core on claim 04-A, attaching the operation record, a damage assessment, and the identification of the crews involved.

The answer took fourteen months.

The forum does not reach the site.

Claims arbitration, response to case 04-A

Forward to the competent authority for instruction of the case.

No forum

Nothing was denied. Nothing was authorised. The complaint was not dismissed: it was not heard.

The company that commissioned the operation ceased trading the following cycle. The contractor engaged has never denied fulfilling the contract, and is the only one of the five of whom that can be said.

Record REC TELLAN Classification: Predates the Register

The report that was filed

Origin: Thermal alloy foundry · outside jurisdiction

Author of the report. Hired by the faction that read it.
Author of the report. Hired by the faction that read it.

A blast furnace operator recorded, in writing, that chamber three showed an acoustic signature consistent with imminent lining failure. The document was received, logged and filed with no further action.

Received. No indication of immediate risk. To be filed.

The failure occurred two shifts later. Three deaths.

Two of the people present on that shift work in the Register today, hired by the same faction. One was taken on for the technical competence demonstrated in the filed report. The other was taken on without the incident being raised at interview.

There is no record of them having discussed it.

Record REC 27-P Classification: Incomplete

The silent shift

Origin: Signal correlation · prospecting satellites

27-P. No surface telemetry available.
27-P. No surface telemetry available.

Claim 27-P suffers permanent ionospheric interference. Surface emissions reach the prospecting satellites with a signature consistent with background noise.

On a given shift, an emission from the surface of 27-P was classified as interference. Reclassification occurred after the shift had closed.

The analyst responsible for the classification works in the Register today. An operator present on that shift also works in the Register today. They appear on separate personnel rolls and there is no indication that they know each other.

Recommendation: do not correlate the two records in any report delivered to a holder.

Record REC RET-C Classification: Closed

The last convoy

Origin: Primary logistics · demobilisation

Extraction site after demobilisation. Plant intact.
Extraction site after demobilisation. Plant intact.

The demobilisation of the primary holders consumed six months of continuous outbound traffic. Escort and transport were maintained until the last recorded transit.

The routes were decommissioned by a two-line internal memo, with no prior notice to escort personnel.

A considerable share of that personnel came down to the Register in the following cycles. It is the group with the longest average service and the lowest rehiring rate among the factions, which performance does not explain.

Record REC FW-02D Classification: Restricted

Those who measured first

Origin: Survey programme · 02-D holdings

Listening room. Holdings in processing.
Listening room. Holdings in processing.

The survey programme catalogued and measured the sites of the Register before any extraction. It ended when its budget did. The holdings remain at installation 02-D, with no current inventory.

Internal estimate: a significant share of the seams listed in the holdings has never been found again in the field. For those sites, the public catalogue of the Register carries data of unconfirmed origin.

Surviving programme personnel: under survey. High priority.

Record PROG CM Classification: In force

Continuing maintenance

Origin: Meridiano Biotec · contract terms

Field laboratory. Maintenance stock.
Field laboratory. Maintenance stock.

The Continuing Maintenance Programme provides prosthetics, grafts and maintenance treatment to uncovered operators against consideration rendered in service.

The contract sets no end date. Consideration is assessed per cycle and does not admit early settlement.

The programme is the largest indirect employer in the Register. Enrolled operators show reduced mobility between holders, which Meridiano describes in its own documentation as roll stability.

Record — Classification: No classification assigned

The number

Origin: Single origin · no backup copy

Consolidated treatments per cycle, all factions, all registered holders.

Do not distribute. Do not cite in any delivered report. Do not confirm existence.

End of recovered holdings

The rest did not come.

What exists of the Register through public channels is in the catalogue and the personnel roll.